A Multiperspective Model for Environmental Risk Assessment in Oil and Gas Industries

Document Type : Original Article

Author
Department of Oil & Gas Contracts and Management, Petroleum University of Technology (PUT), Tehran, Iran.
Abstract
The motivation of this article is the way of ranking hazards through ERA (Environmental Risk Assessment), espacially in O&G industries (Oil & Gas). The paper reviews the related literature, and proposes a flexible ERA model incorporating several risk measures, such as risk impact, risk vulnerabilityt, risk exposure, risk manageability, risk controllability, risk urgency, risk growth, risk probability, risk detection, risk timeframe, risk effect delay, risk awareness, and risk outrage. The model was applied in risk assessment of a storage room of hazardous chemicals in a real-world problem. The results showed that the most important hazard was explosion of the storage. After this major hazard, ranking are explosion, then toxic hazard and leackage.

Graphical Abstract

A Multiperspective Model for Environmental Risk Assessment in Oil and Gas Industries
Keywords
Subjects

[1] Abtahi, S. E., Kalhor, R., Sedaghat-shayegan, D. Journal of Farayandno, 2022, 17(77), 70-90, [in Persian].
[2] Dobson, M.S., Leemann, T. Creative Project Management. McGraw-Hill, U.S. 2010.
[3] ANZS (Australia and New Zealand Standards). AS/NZS 4360:2004: Risk Management, Sydney, NSW. 2004.
[4] Balica, S. F., Wright, N. G., Ven-der-meulen, F. Natural Hazards. 2012, doi:10.1007/s11069-012-0234-1.
[5] Cunningham, D. J. The Application of Risk Analysis Tools in Civil Defense Emergency Management Planning in New Zealand. Masters Thesis, Massey University, Palmerston North. 2006.
[6] Granger, K. Hazards and risk concepts’ in K. Granger and M. Hayne (editors). Natural hazards and the risk they pose to south-east Queensland. Geoscience Australia, Canberra, 2001, pp. 1.1–1.13.
[7] Hatefi, M. A. Soft Computing, 2024, 28, 281-303.
[8] Institute for International Development. Summary Report for the Emergency Risk Management Plan City of Newcastle. Report prepared for city of Newcastle, Adelaide. 2007.
[9] Jaafari, A. International Journal of Project Management, 2001, 19, 89-101.
[10] Jing, H., Zhang, S., Zhao, D., Wang, Z., Liao, J., Li, Z. Applied Sciences, 2025, 15(16), 9135.
[11] Karagiorgos, K., Grahn, T. International Journal of Disaster Risk Reduction, 2025, 127, 105683.
[12] Kepner, C., Tregoe, B. The new rational manager. Kepner-Tregoe Inc., Princeton, New Jersey. 1981.
[13] Lawrence, O., Hyginus, O. International Journal of Research Studies in Science, Engineering and Technology, 2017, 4(10), 22-29.
[14] New Zealand MCDEM. Major Wellington Earthquake National Initial Response Plan. Wellington: Ministry of Civil Defense and Emergency Management, 2009.
[15] Nazrul-islam. M. D., Abdul-malak, M. D., Nazrul-islam. M. Natural Hazards, 2013, 69, 2083-2103. DOI 10.1007/s11069-013-0796-6.
[16] Peyro, M. R., Masihi, M. (2024). Journal of Environmental Economics and Chemical Processes, 2024, 1(1), 19-25.
[17] PMI (Project Management Institute). A Guide to the Project Management Body of Knowledge (PMBoK). Newtown Square. Pennsylvania, USA. 2013.
[18] Razavi, S.A., Asgary, A., Khaleghi, M. International Journal of Disaster Risk Science, 2022, 13(3), 391-400.
[19] Seyedhoseini, S. M., Hatefi, M. A. Scientia Iranica, 2009, 16(2), 138-148.
[20] Seyedhoseini S. M., Noori S., Hatefi M. A., Risk Analysis: an International Journal, 2009, 29(5), 752-763.
[21] Shafiei-moghaddam, P., Jahangiri, K., Hassani, N. Heliyon, 2024. 10(8), e28797.